Seal Support System

Seal Support System

API PLAN 53B

API PLAN 53B

Product Description

Item Description
N1
To Seal
N2
From Seal
N3
Vent
N4
Drain
N5
Cooling water inlet
N6
Cooling water outlet
N7
Cooling water Vent
N8
Cooling water Drain

  • It is used in services where the process fluid leakage is eliminated.
  • Successfully used where the box pressure exceeds 10.0 Kg/Cm2 and temperature above 50 Deg C.
  • It is used where safety is of utmost importance and the media being sealed is extremely hazardous.
  • Preferably used where the margin between the box pressure and the vapour pressure at the pumping temperature is less.
  • Used in critical high pressure applications where use of plan 53A would allow nitrogen to become vapour and cause cavitation near the seal faces.
  • Used in applications where additional heat removal is required from the inner seal.

  • Enhanced seal life at higher pressure and temperature as mixing of nitrogen with the barrier liquid is eliminated
  • There is no chance of the hazardous process liquid to leak provided barrier pressure is maintained.
  • Enhanced cooling of the inner and the outer seals
  • Make up of nitrogen pressure in the bladder accumulator using nitrogen charging kit is possible.
  • Monitoring of both inner seal leakage and outer seal leakage is possible.

  • Bladder accumulator in either carbon steel or SS316L and bladder material in nitrile for temperature up 120 Deg C & Viton for higher temperature
  • Capacity of bladder accumulator : 20 Liters 35 Liters 50 Liters Others as per requirement.
  • Heat Exchangers - Air Cooled either natural or forced circulation type - Finned tubes Heat Exchanger- Water cooled
  • A decrease in pressure indicates either inner seal or outer seal has leaked
  • Circulation is provided with the help of internal circulating devices line pumping ring, pumping screw.
  • Designed in accordance with ASME Section VIII Division 1 and API Standard
  • Bladder is pre-charged with 90% of working pressure
  • Based on API 682 4TH edition, pressure alarm is being set considering maximum and minimum temperature of site location.
  • Transmitters are either HART or foundation fieldbus (FF) protocol